Kipling Power Plant
March 24, 2019Coke Boiler Replacement
March 24, 2019
Detailed design and engineering, supply of materials, supply of labor, Supervision, assembly, installation of free issued items, inspection, testing, resolving the punch list points, documentation and preparation for shipment of Two (2) E-House modular buildings.