85RA 1000 & 2000 Modular Buildings

Kipling Power Plant
March 24, 2019
Coke Boiler Replacement
March 24, 2019

85RA 1000 & 2000 Modular Buildings

Detailed design and engineering, supply of materials, supply of labor, Supervision, assembly, installation of free issued items, inspection, testing, resolving the punch list points, documentation and preparation for shipment of Two (2) E-House modular buildings.

Leave a Reply

Your email address will not be published. Required fields are marked *

WhatsApp chat